22-7745- Repair Transformers Multi; Cape Canaveral Space Force Station, FL
The contractor will provide all labor, materials, equipment, transportation, and supervision to accomplish the following requirements in this Statement of Work (SOW), design drawings & technical specifications dated 26 February 2026 for a complete and usable facility(s).
22-7745 - Replacement of seven (7) pad mounted transformers -- W26IF, W21IF, CX37I8, UCS24CF, TTI18, TTI16, and TTI15 – located near or within the Integrated Test Launch (ITL) Area.
25-1711 - Replacement of nine (9) pad mounted transformers – TTI4, TTLDA, TTI3, POBIF, OTCI, UCS26IF, FSI1, HTFI1, and TWIF3 – located in the processing and support areas.
25-1712 -. Replacement eight (8) pad mounted transformers -- MPI, FSPI, UCS231, CSC3, CPI2, BBI, HCIF3, and CX31IV8) – located near the Launch Operations Control Center (LOCC), B27220, and the Morrell Operations Control Center (MOCC), B81900
25-1713 - Repair by replacement of nine (9) pad mounted transformers – RCC8, PSLI, SPI5, UT1IF, HUI3, HUI2, HTI2, SBI1, and GFSI – located near the northwest section of the Industrial Area.
Site visit 06/24/26 1pm- meet 15 minutes before the start of the site visit. Refer to Rules of Engagement for location. Badge forms are needed no later than 10am 06/22/26.
RFI's due to ABBA by 10am 06/29/26.
Bid Due Date: 07/27/2026