The work includes full depth repair (asphalt pavement, base material, and stabilized subgrade) in a section of Taxiway G and incidental related work.
120 days design/45 days construction.
Site visit 8am 04/23/23 after the GC meeting in Main Conference Room Bldg. 30.
RFI's due to ABBA by 4pm 05/06/26.