Scope of work: Repair 24 medium-voltage electrical switchgears located across Patrick SFB. The existing medium-voltage electrical switchgears will be demolished and replaced with new switchgears. Some existing concrete slabs will be extended by approx 300sf in total and approx 60 bollards will be replaced by switchgears that are located near roads. A steel frame will be constructed to protec the switchgears.
Login to view files